An official website of the United States government
Here's how you know
A .mil website belongs to an official U.S. Department of Defense organization in the United States.
A lock (lock ) or https:// means you’ve safely connected to the .mil website. Share sensitive information only on official, secure websites.

Home : Articles
Would you stake your life, right now, on the condition of your equipment?
Articles
NEWS | Oct. 2, 2020

Communications: Submitting PQDRs to CECOM

Preparing paperwork
Photo by Spc. Isaiah Matthews
 
Dear Editor,

It happens sometimes. We work hard at CECOM to make sure it doesn’t but sometimes, we send out equipment that just doesn’t work as it should. If your readers have ever received such equipment, they may already be familiar with submitting a Product Quality Deficiency Report (PQDR).

Whenever a PQDR is submitted, it’s sent to the appropriate Army Life Cycle Management Command (LCMC), such as CECOM, for resolution. While each LCMC manages different commodities and equipment for the Army, there are some common things we need to know for every PQDR that is submitted. Would you pass on the following guidance to your readers?
 
PQDR Guidance

When you initially submit a PQDR, providing detailed information on the SF-368 can help expedite the investigation. When preparing the SF-368, it’s crucial to complete all the fields marked as mandatory.

The criteria for submitting a PQDR is that the equipment does not meet its intended form, fit or function. These terms are a bit broad; that’s why we need a full description of how the piece of equipment or item failed to perform as expected. You’re making a judgment call. The investigation that follows your PQDR submission will validate whether your assessment merits further analysis and possible changes or enhancements. If you tried to troubleshoot the issue, tell us that too. This “Description of Deficiency” field is also a good place to advise us if you’re unable to provide the mandatory information in other fields.

In addition to describing what’s wrong with the equipment, there’s documentation we need that is critical to the investigation process. The government contracts with many different suppliers and the documentation you provide helps us identify the company that made the equipment so we can work with them to get it repaired, replaced or issue credit. A lot of the information we need comes with the equipment when it’s received.

Pictures are vital. Sometimes they tell a better story than words. Take multiple pictures, especially if the deficiency can be shown in pictures. We need pictures of various parts or components involved and all the labels, plates and markings on the part(s), as well as the packaging. We recommend keeping all the original packaging each part comes in and the paperwork that comes with it until you know the part works. If you can’t keep the packaging, take pictures of all packaging and paperwork.

We also need a valid contract number and document number. In order to receive credit, we must have the document number that was used to order the part. That information is usually found on DD Form 1348-1A, while the contract number can often be found on the packaging or part itself.

Submitting a PQDR doesn’t help just you; it also helps the LCMCs identify parts of the equipment that may need to be reviewed for improvement to avoid future issues. The PQDR form can also be submitted if you have an equipment improvement recommendation, a warranty claim action or if you’re reporting equipment that you suspect may be counterfeit. Your input is invaluable to all of these activities.

PQDRs are submitted through the Product Data Reporting and Evaluation Program (PDREP) website at:
 

Users with valid user IDs can log on directly to the PDREP website to submit PQDRs and upload pictures. In order to get a user ID, an access request must be submitted through the PDREP website. There are also helpful manuals on the website that will help guide you through the process of submitting a PQDR. 

If you have questions about submitting a PQDR for CECOM-managed equipment, feel free to email us:
 
 
Leticia Williams
CECOM PQDR Program Administrator
APG, MD
Editor’s note: We’re glad to share this guidance. Thank you, Ms. Williams.          
Want to get better search results faster? 
Click the link below to access our "how to" guide
.
After entering a keyword, you must hit or click the Search bar/box below for the function to work.
Simply hitting Return won't yield results.
LOGSA Links/URLs
Note about links to archive articles

If you come across a link to a pre-2014 PS Magazine issue or article that uses LOGSA in the web address (URL), use this link instead:
 
For issues/articles from 2014 and after, click on the Archive/Index tab in the top menu of this website.

BE ADVISED: With the migration to Army365, emails in older articles may still reflect an @mail.mil address. To update, change the domain to @army.mil